Year | Scope Of Work | End User |
---|---|---|
2012 | Project management Support and Engineering Support for Upgradation of Rig HIGH ISLAND IX | Transocean. |
Scope | Deliverables | |
1 | Main Engine Upgarde | |
1) Design Report for Temporary stiffening 2) Deck opening for Engine removal & New engine placement |
||
2 | Seajet unit installation (fwd) | |
1) Arrangement drawing for new platform 2) Strength analysis report for new platfrom 3) Design drawing for new platform |
||
3 | Seajet unit installation (Aft) | |
1) Arrangement drawing for new platform 2) Strength analysis report 3) Design drawing for modification of platform |
||
4 | Seajet unit installation (Aft) | |
1) Strength analysis report of MGs system installation 2) Design drawings for installation of MGS system |
||
5 | Radiator Units upgradation | |
1) Strength analysis report for foundation 2) Design drawings for platform modification 3) Design drawing for paint store structure |
6 | Slug Pit Upgrade | |
1) Detail of new bulkhead in Slug Pit |
||
7 | Raw water tower Closing | |
1) Drawings for Structural Modidications 2) Strength analysis report for modifications |
||
8 | BOP Lift Frame Design | |
1) Proposal for Lift frame modification 2) Design Drawing for BOP Lift Frame 3) Strength Calculation for BOP Lift Frame |
||
9 | FRC Platform | |
1) Design Drawing for FRC Platform 2) Strength Calculation for FRC Platform |
||
10 | Drillfloor Tuggers Upgradation | |
1) Foundation drawing for Upgrade of Tuggers on Drill floor 2) Foundation drawing for Upgrade of Tuggers on Drill floor 3) Foundation drawing for new Tugger on Drillfloor 4) Strength Analysis for new foundations on drill floor |
||
11 | Man-Rider Unit Installation | |
1) Foundation drawing for Man Rider on Shelter deck 2) Strength Analysis for new foundations for man-rider unit |
12 | Crane Access Platform Modifications | |
1) Bow Crane platform modifications layout 2) Port aft Crane platform modifications layout 3) Stbd aft Crane platform modifications layout 4) Crane platforms above counterweight_ structural drawings 5) Crane platforms above counterweight_ structural drawings 6) Bow Crane platform on pedestal_ structural drawings 7) Port aft Crane platform on pedestal_ structural drawings 8) Stbd aft Crane platform on pedestal_structural drawings 9) Crane platform modifications-strength report |
||
13 | Transformer Platform Extension | |
1) Strength Calculation for transformer Platform 2) Design Drawing for transformer Platform 3) Port aft Crane platform on conterweight_ structural drawings |
||
14 | Burner Boom Foundation | |
1) Design Drawing for Burner Boom Foundation 2) Strength Calculation for foundation structure |
||
15 | Wireline Unit Relocation | |
1) Design Drawing for Wireline unit relocation 2) Strength Calculation for wireline unit relocation |
||
16 | UPS/MCC Room | |
1) Design Drawing for UPS room 2) Strength Calculation for room structure |
17 | Reactor Platforms in SCR Room | |
1) Design Drawing for reactor platforms 2) Strength Calculation for reactor platforms |
||
18 | New stairs for cranes | |
1) Design drawings for new stairs 2) Strength Calculations for new stairs |
||
19 | New Compressor Platform | |
1) Layout drawing for new platform 2) Design drawings for new Platform 3) Strength Calculations for platform structure |
||
20 | New Transformer Platforms | |
1) Strength Calculation for transformer Platform 2) Design Drawing for transformer Platform |
||
21 | Platform around new Engines | |
1) Strength Calculation for new platform iwo new engines 2) Design Drawing for new platform |
||
22 | BOP Trolley Beam | |
1) Strength Calculation for trolley beam 2) Design Drawing for trolley beam modifications |
||
23 | New Mosque Structure | |
1) Design drawings for new mosque 2) Strength Calculations for mosque structure |
Year | Scope Of Work | End User |
---|---|---|
2012 | Project Management Support and Engineering Support for Upgradation of Liftboat Dixie Patriot for Dolphin project | Gulf Lift Boats. |
Work Scopes | ||
1 | Helideck Replacement | |
Strength Analysis of the helideck support structure as per DNV code for replacing the existing pancake with a bigger one | ||
2 | Accommodation Modules on Deck and Support Systems | |
1) Engineering for design of the module support structure 2) Design calculations for the foundations |
||
3 | Modification of Tanks | |
1) Structural design for the tank modification 2) Design calculations for the modified structure |
4 | Installation of Lifeboats and Engineering Support | |
1) Design and preparation of design drawings for the lifeboat platform 2) Design calculations for the platform extension and modifications |
||
5 | Fire Fighting System & Service Lines to Dolphin Platforms | |
6 | Design of 25m Gangway and Access Tower | |
1) Structural design for the 25m gangway and access tower as per QP requirements 2) Design calculations for the gangway structure |
||
7 | Inclining Experiment & Stability Documentation | |
1) Preparation of inclining procedure 2) Conduct inclining experiment 3) Preparation of Inclining experiment report 4) Updation of Stability documentation |
8 | Selective Preloading Procedure | |
1) Preparation of selective preloading procedure for achieving required leg penetration at specific site |
||
9 | Lift Plan Method Statement at DOL Platforms | |
1) Preparation of method statement and procedure for lifting of equipments from DOL fixed offshore platform as per Dolphin requirements. |
||